Menu
Tel +7 4997533380
Tel +39 3934943453

Change market



Select language





Tel +39 0743 293801

  • AZIONE IV AZIONE 4.1.1”Sostegno agli investimenti per l’efficienza energetica e l’utilizzo delle fonti di energia rinnovabili 2016”

AZIONE IV AZIONE 4.1.1

AZIONE IV AZIONE 4.1.1

“Investment support for energy efficiency and use of 2016 renewable energy sources”

Synthetic Description of the Photovoltaic Intervention:
The works in the project concern the installation of a photovoltaic system for the production of electricity of 470.4 kW on site, installed on the roof of the building, located in the Municipality of Spoleto (PG), Via della Meccanica, 20. The production of the plant will be used for coverage in the F1 segment, of part of the consumption made by user to which it will be connected.

Synthetic Description Lighting Intervention:
The works in the project concern the replacement of the current luminaires with LED luminaires and equipped with presence / illumination sensors, to serve the Production Area and the Offices, of the Building located in the Municipality of Spoleto (PG), Via della Meccanica, 20.